DEESIDE POWER STATION

THE PRODUCTION PROCESS

Diagram of production process with hot spot links Hot spot link to Natural Gas page Hot spot link to Flue Gases page Hot spot link to Electricity page Hot spot link to Cooling Water page Hot spot link to Waste page

This diagram shows the process of electricity production at Deeside Power Station with fuel and water inputs and outputs.

Deeside has two gas turbines with an average output of 170 MW and the waste heat from these is used to produce steam to drive a 170 megawatt steam turbine.

Re-using the waste heat from the gas turbines makes a CCGT one of the most efficient ways of generating electricity.